Digital Dailies
Pre-Show        Day One        Day Two        Day Three        Day Four        Contact Us        COVERINGS Home
 

Schedule At-A-Glance

FULL SCHEDULE

Friday, April 24, 2009

9:00 – 10:00 am

Using the Revised ANSI A137.1 Ceramic Tile Standard to Understand Tile Performance and Precision of Manufacture When Specifying or Installing Ceramic Tile
Room S102BC

Retail Sales – Taking Care of the Customer
Room S105BC

What’s New with Moisture And Concrete
Room S103BC

LEED Simplified for Contractors
Room S105D

9:00 – 11:00 am

Fabricators Forum
Room S105A

NTCA Workshop Program Featured at Coverings 2009

April 9, 2009

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare

NTCA training director Gerald Sloan will present the NTCA Workshop as part of the installation demos on the TCNA stage at Coverings.
NTCA training director Gerald Sloan will present the NTCA Workshop as part of the installation demos on the TCNA stage at Coverings.


This year, the installation demonstrations presented by the National Tile Contractors Association (NTCA) at Coverings will be presented in a NTCA Workshop Program format. This traveling educational program has enriched the training of tile installers and contractors for more than 30 years with information relating to the development of new standards and the demonstration of proper techniques for the successful installation of ceramic tile.

During Coverings 2009, the NTCA Workshop Program will be offered free on the Tile Council of North America’s live demonstration stage. The NTCA Workshop Program will be broken into four parts to cover each day of the show, with the following schedule, from 11:15 a.m. to noon each day:

  • Tuesday, April 21: Movement Accommodation
  • Wednesday, April 22: Water Management
  • Thursday, April 23: Appropriate Materials Selection
  • Friday, April 24: Five Common Mistakes Made Before the First Tile is Installed


|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.
Proud Sponsors
BNP Media